Time period
Object
Construction cost
Client
Services

Grundstück
2019-2016
>25 Mio
Hafenbogen GmbH & Co. KG
thermal construction physics, building and room acoustic, daylight simulation, construction noise and immission insulation, measurment of outside noise including aircraft noise, assessment of relevant exterior noise level

170224_lindley quartier gkk_01
2018-2016
8 Mio
Lang & Cie. Real Estate AG
thermal builbing physics, room acoustics, day light calculation, thermal building simulation, construction noise and immission control concept

IMG_5798
2018-2015
23 Mio. 
Lang+Cie
noise insulation certificate, immission insulation for car park and ventilation system, room acoustics, LEED simulation, noise immission calculation for mechanical workshop, construction noise concept, daylight simulation for LEED

20170428_LWI_Kornmarktpass_088
2017-2011
>25 Mio
OFB
thermal simulation, immission insulation cretificate, construction noise concept and construction noise measurment, ENEV-certificate, construction and room acoustics

_DSCN4418
2017 - 2015
10Mio
Lang & Cie. GmbH
thermal insulation, noise control, acoustics, H&S, DGNB, energy concept, daylight calculation, thermal building simulation, immision control, construction noise concept

IMG_0813
2017 - 2015
Lang&Cie. GmbH
thermal and sound insulation, acoustic, immission insulation, construction noise, thermal building simulation for maintenance of the summer thermal insulation, SIGEKO

_DSCN5711
2017 - 2015
9 Mio.
Lang & Cie. GmbH
building physics, SiGe, thermal insulation, noise control, immission control, construction noise concept, room acoustics, Leed certification, building and daylight simulation, thermal comfort simulation

2014-2012
BKRZ Frankfurt
structural engineering HOAI 1-8, thermal and sound insulation, structural fire protection, thermal building simulation, planing of a passive house

20170511_LWI_HOLM_044
2014-2011
35 Mio. 
Lang+Cie Hr. Geiger

DSC_0208
2013-2012
15 Mio.
PM Architekten
Hr. Pischulti

DSC_6018
2013-2011
15 Mio.
Lang+Cie Hr. Glatter
Thermal insulation, noise controll, DGNB Audit, room acoustics, room acoustics simulation, thermal simulation, daylight simulation, thermal building physics, sound immission calculation, sound measurement

DSC_7149
2013-2011
Codema Fr. Schimsheimer

2012-2006
Hochbauamt Frankfurt/Hr. Rook

_MG_9037
2011-2007
6 Mio.
Hochbauamt Stadt Frankfurt
strucuteal engineering HOAI 1-8, thermal and sound insulation, structural fire protection and safety plan, temperatural calculation of steel beams, feasibility study of roofing a yard with unprotected steel

2011
Hochbauamt Frankfurt Hr. Boy

20170224_LWI_Whafenkontor_037
2010-2008
7 Mio.
OFB Hr. Berg

20170224_LWI_Werfthaus_046
2008-2007
30 Mio. 
Groß+Partner/OFB
Hr. Unger
constructural engineering HOAI 1-6, EnEv 2009, thermal construction physics, thermal simulation, sound insulation and room acoustics

2006
Grundbesitzanlage GmbH

20170224_LWI_HAZP_072
2005
9 Mio.
OFB

2004-2000
30 Mio. 
Arch. Heil/Hr. Heil

2004
Facility Management der Clariant GmbH

2003-2002
9 Mio. 
Lupp Hr. Unterlerchner

2003
2.4 Mio.
Frick+Reichert Architekten, Frankfurt

2003
Arch. Heil Frankfurt

S1200026
2003
Arch. Scharnberger Frankfurt

vogstrklein
2001
3 Mio. 
Frick+Reichert, Frankfurt

2000
Arch. Boethling, Offenbach

1999
Arch. Hahnenfeld, Frankfurt

1998
5 Mio.
Arch. Gallwitz

1997
15 Mio.
Arch. Frick+Frick, Frankfurt