Time period
Object
Construction cost
Client
Services

20180725_Happ_Dorotheen_082
2019-2017
9 Mio.
OFB Hr. Hundertmark
structural engineering HOAI 1-8, preventive fire protection, Planning of Evacuation and Rescue Ways

2018-2016
5 Mio.
Arthur Wiener Liegenschaften
structural engineering HOAI1-8, sound and thermal insulation, construction noise and immission control concept, calculation of external noise by noise measuremen

20180521_LWI_unIQus_011
2017-2015
14 Mio.
OFB Hr. Hundertmark
structural engineering HOAI 1-8, structural fire protection, planing of evacuation and rescue ways

20180429_LWI_4JZ_057
2017-2010
10,5 Mio.
Planungsring
Ressel GmbH
Hr. Werner
constructional fire protection, structural engineering HOAI1-8, noise and sound insulation, concrete repair report

20180419_LWI_Raimund_017
2017-2000
7,5 Mio. 
DeTe-Immobilien/Strabag Hr. Rockel
structural engineering HOAI 1-4, constructional fire protection, sound and thermal insulation, 3-D calculation of thermal bridges, sound measuring on the stock, calculation of the sound immission

20180501_LWI_Mylius3337_031
2015-2011
7,0 Mio.
Lang+Cie, Fr. Keilholz
structural engineering HOAI 1-6, fire protection and safety plan, temperaural calculation of ripped ceiling, sound insulation, EnEV, sound immission insulation, room acoustics, construction noise measurment , calculation of shading of the entrance foyer

2013-2001
30 Mio. 
OFB Hr. Hablowetz
structural engineering HOAI 1-4, EnEV 2002-2009, thermal construction physiks, sound insulation, room acoustics, concept of a passive house within an acquisition

DSC_3915
2013
2,5 Mio.
Horiba
sound immission calcutlaion according BimschV and TA Lärm (German Technical Guidelines for noise reduction), thermal and sound insulation, fire protection and safety plan, structural engineering HOAI1-6

20140929_144241
2012-2010
1,5 Mio. 
Architekturbüro Scharnberger
structural engineering HOAI 1-6, EnEV 2009, thermal constructural physics, sound and immission insulation, fire and safety plan

2011-2009
1,5 Mio. 
Fabergé-Museum
structural engineering HOAI 1-6, EnEV 2009, thermla construction physics, sound insulation

IMG_2598
2010-2008
95 Mio. 
Lang+ Groß
Fr. Keilholz
structural engineering HOAI 1-4,energy concept, EnEV 2009, thermal construction physics, temperatural calculation of steel stairs and freehanging boxes at the Atrium

DSC_1215
2010-2007
5 Mio. 
OFB Hr. Bender
structural engineering HOAI 1-6, EnEV 2009, thermal construction physics, sound and immission insulation, fire protection and safety plan, calculation and simulation of the room acoustics

20170224_LWI_Werfthaus_046
2008-2007
30 Mio. 
Groß+Partner/OFB
Hr. Unger
constructural engineering HOAI 1-6, EnEv 2009, thermal construction physics, thermal simulation, sound insulation and room acoustics

IMG-20140520-02525
2008-2007
3 Mio. 
OFB Hr. Kunz
structural engineering HOAI 1-6, thermal construcation ophysics, calculation of thermal bridges, sound calculation and insulation, room acoustics

IMG-20120705-02069
2008-2006
7,5  Mio. 
Adina
Hr. Patrick Finney
structural engineering HOAI1-6, structural fire protection

DSC_1217
2006-2005
0,9  Mio. 
CGI /Hr.Löffler
Structural engineering HOAI 1-6, structural fire protection an safety plan

IMG_0001
2006-2005
10 Mio. 
HVB Immobilien
Hr. Sopar

2014-07-16 11.32.36
2005
15 Mio. 
Lupp Hr. Unterlerchner

2004-2003
2,4 Mio.
Arch. Nitsch, Frankfurt

DSC_1251
2004-2002
6 Mio. 
Helvetia Versicherung/Hr.Lewalter

2004-2000
30 Mio. 
Arch. Heil/Hr. Heil

2003-2002
9 Mio. 
Lupp Hr. Unterlerchner

S1200026
2003
Arch. Scharnberger Frankfurt

DSC_1132
2002-2000
60 Mio. 
SOM New York

vogstrklein
2001
3 Mio. 
Frick+Reichert, Frankfurt

DSC_1238
2000-1996
18 Mio.
Helvetia Versicherung/Hr.Lewalter

1999
Arch. Hahnenfeld, Frankfurt

1998-1996
18 Mio. 
Opel

1997 - 1996
4,5 Mio. 
Gesipa

1997
15 Mio.
Arch. Frick+Frick, Frankfurt

1996-1991
54 Mio. 
H. Quandt Vermögensverwaltung
Bad Homburg

DSC_5965
1995 - 1992
60 Mio.
Bayr. Hypobank jetzt Unicredit/Hr. Sopar

1994-1990
6 Mio. 
Liegenschaftsverwaltung Diehl, Frankfurt

1994
50 Mio.
Arch. Köhler

1992-1991
22,5 Mio. 
Arch. Wölk

1990
7,5 Mio. 
Arch. Heil, Frankfurt

1989-1988
9 Mio. 
Arch. Heil, Frankfurt

dt_fachverlag
1988-1987
27 Mio. 
Arch. NHT,
Frankfurt am Main